Updated Articles

  1. Standard Controls Product Specification

    This is how a Standard Controls Product Specification should be built. See (------) for template. Background The background shall explain the situation from a higher level and why the product is needed. It shall clarify how the build-up is divide...
  2. Good manufacturing practices (GMP)

    Quality assurance system The business operator shall establish, implement and ensure adherence to an effective and documented quality assurance system. Operations shall be carried out in accordance with pre-established instructions and procedures. ...
  3. Food Safety

  4. Labels

    Label types: Product label Machine label Packaging label Warning label FlexLink logo label Product label Products, unless a machine, shall be marked with a product label. For more information of selection and location, see document 510...
  5. Zollner/Beckman Coulter

    Request form to fill in for design change (internal or external), new item or change of supplier: Change request/New item form.xlsx ...
  6. Maintenance for customer specific items

    Customers: JJS/Ocado Zollner/Beckman Coulter To be added. ...
  7. Product Quality maintenance instruction

    Purpose This document describes how FlexLink PSD, Product Quality and Testing Department operates to secure that the need for approval of new items or change of already existing items are performed in a structured and controlled way and in correc...
  8. How to update items in Coral

    General info Toolbound items and some machined are made on FlexLink drawings and 3D files. BC drawing shall be attached as a ”Related document”. All other items (cut beams, slide rails, assemblies etc) are made on BC drawings. In some cases a 3D ...
  9. JJS/Ocado

    How to update items for JJS/Ocado in Coral & SAP Coral: All updates in Coral should be done according to the normal FlexLink standard rules but JJS/Ocado drawing number and revision should be updated in the Description field. If a beam length ...
  10. Design checklist

    Use this checklist as help to cover necessary information when designing an item. Go through the list before initiating the internal preparation workflow. The internal preparation shall be in a general level and does not include examination of the ...